Track Safety - Personal Track Safety (PTS)
Track Safety - SAR Protection Officer / ERDB Person in Charge.
Track Safety - ERDB Worksite Supervisor (WS).
Track Safety - Hand Signaler
Track Safety - ERDB Possession Supervisor (PS).
Track Safety - Points Operator.
P-way Engineering - Basic Track Design.
P-way Engineering - Critical Rail Temperature - CRT Management.
P-Way Engineering - Derailment Investigation.
P-Way Engineering - Electrification Engineering Principles.
P-Way Engineering - Grinding Operative - Plain Line.
P-Way Engineering - Grinding Operative - Plain Line and S&C initial.
P-way Engineering - Grinding Manager.
P-way Engineering - Hallade Appreciation.
P-way Engineeing - Hot Weather Watchman - Monitor Infrastructure.
P-way Engineering - Inspection and Maintenance of Plain Line.
P-way Engineering - Inspection and Maintenance of Sidings and Depots.
P-way Engineering - Inspection and Maintenance of Switches and Crossings.
P-way Engineering - Installation of Speed Boards.
P-Way Engineering - Introduction to permanent way.
P-Way Engineering - None destructive testing (NDT) of rail.
P-Way Engineering - Stressing for Designers.
P-Way Engineering - Stressing of CWR - Level 1 and 2 combined.
P-Way Engineering Track Geometry Supervisor (TGS).
P-way Engineering - Track Hand-back - Initial.
P-Way Engineering - Track Hand-back - assessment
P-Way Engineering - Track Patroller.
P-Way Engineering - Track realignment - Hallade method.
P-Way Engineering - Undertake detailed crossing inspection.
P-Way Engineering - Undertake detailed inspection of switches.
Small Plant - Abrasive Wheels.
Small Plant - Cable avoidance equipment.
Small Plant - Chambre Rail Drill.
Small Plant - Disc Cutter.
Small Plant - Impact wrench.
Small Plant - Sleeper drill.
P-Way Engineering - Stressing of CWR - Level 3
P-Way Engineering - Switch and crossing design Principles
Detailed Inspection Skills of Switches and Cast Crossing